2007 Trail Work -- Melody Lane Trail

 

The trail going down from Melody Lane to Wilder Springs was badly eroded and had lots of large rocks.  There was a limited amount of dirt to work with so the trail is still rocky but a lot smother.

Bad spot at the top of the hill.

 

Going down the trail.  Lots of rocks!

 

Near the bottom of the trail.  ATVs have been going to the left of the washed out area.

 

After:

Repaired area at the top of the trail.

 

Going down the trail.  Lot better!

 

Near the bottom of the trail where the ATVs had been going to the left.