Work was started at the big hill which had been taped off with danger tape.  There were several large rocks near the top of the hill that were difficult to navigate over.  This photo shows one of the rocks after it was broken loose and rolled down the hill.

The picture below shows how deep the trail had eroded.  Viewed from the top of the hill.

 

View from the bottom of the hill.

 

This photo shows the hill after the repairs were completed.