Ultimately 8 loads of fill were hauled.  This was enough material to work about 1/2 way down the trail.

 

 

 

 

 

The following photos were taken before the repairs.

 

 

 

 

 

 

 

 

 

 

 

After the Labor Day holiday the Ranch Riders started repairing Tomichi Pass.  The plan was to haul at least 5 dump truck loads of fill material to deposit on the trail.  In order to do this some of the overgrowth on Melody Trail needed to be cut back to get the dump truck where the fill materials were needed.

 

The skid steer made quick work of hauling off the brush thanks to Chuck's grapple attachment. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The following photos were taken after the repairs and after a heavy rain.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 